STRABAG UK have appointed Cube Lighting and Design to undertake a turnkey LED lighting project. The emphasis for STRABAG is on cost savings and the environmental benefits that LED lighting offers.
The STRABAG facility in Hartlepool will become such a huge part of history for its production of the tunnels for the long awaited HS2 railway.
In the 4 short months we have been involved with this site, it has changed drastically not to mention the amount of jobs it has created. We feel honoured to have been brought in to undertake the design, supply and installation of a new LED lighting system complete with emergency lighting.
We have installed a mixture of flood lights, high bay and NCF battens in various areas on the site as part of phase 1. The fittings range from 50w right up to 287w!! This will give you an understanding of the size of this facility.
With Phase 1 alone the site stand to save 84 tonnes of carbon per year and over 51% in running costs compared to running the old lighting that was in situ.
Sites of this magnitude making the decision to choose green options where possible is incredible to see.